Back
to Mooloolaba, to cross the bar, where the dredge is working the river entrance, so it needs some
caution to cruise into the river. Hurtle
Turtle and WOW are anchored here, waiting to head south. Just before we decided to drop the main,
Peter noticed our main outhaul line had broken, not much we could do under sail
but reef the main, sailed to the bar and sorted it out up in the river. The engineer devised a plan to undo all the
sheaves and jammers, feed a new line through the mast, remove the makings of a
nest (those pesky welcome swallows again!) and re-tie the clew to the outhaul. Job done!
Subscribe to:
Post Comments (Atom)
Heatwave: The Last Post
In December 2016 our adventures on Heatwave began. This catamaran suited us well with plenty of space inside, a comfy cabin for visitors a...
-
In December 2016 our adventures on Heatwave began. This catamaran suited us well with plenty of space inside, a comfy cabin for visitors a...
-
The Amphitheatre Gorge walk was challenging at first, a scramble over large rocks and through spinifex, trying to find the cairns to follow ...
-
The old home town looks the same ... - except for more people, more traffic, more boats on the harbour. It’s been 25 years since we live...
No comments:
Post a Comment