Summer Projects
Engine
repairs – all finally fixed and running; injector timing was the key. Engine insulation replaced – a great indoor activity of scraping out the old and creating a pile of dust, then gluing in the new.
Hot water – Peter removed the port hot water tank and re-plumbed the galley sink to the starboard
tank, saving weight and power.
Watermaker
– sold the old one and Peter completed the installation of the new Stella; first TDS test reads 200 ppm – drinkable water,
Yay!
Galley sink
tap, which had corroded to no longer swivel, replaced with a shiny new swivel
mixer tap. Galley wench very happy J